Pricing
Based in Franklin, North Carolina. Serving Franklin, Highlands, Cashiers, Sylva, and Bryson City.
Labor only — materials separate. Pricing below is designed to be simple and easy to understand.
10% Discount
Senior & Veteran discount available.
Minimum Job Charge
$200 minimum applies only when the total project price is under $200.
Standard Room Pricing (Labor Only)
Bedrooms
-
Standard bedroomUp to 12×12, 8 ft ceilings$275
-
Medium bedroomUp to 14×14$365
-
Large bedroomUp to 16×16$415
-
Extra-large bedroomUp to 18×18$475
Living Rooms
-
Standard living roomSimilar to 12×12–14×14$350
-
Medium living room$440
-
Large living room$490
-
Open / oversized living areaFinal price depends on layout and cut-ins$550+
Kitchens (Walls Only)
-
Small to standard kitchen$295
-
Large kitchen / heavy cabinet cut-ins$375+
Bathrooms (Walls Only)
-
Small bathroom / half bathMinimum$200
-
Standard full bathroom$250
-
Large or master bathroom$325+
Ceiling Height Adjustment
-
9–10 ft ceilingsAdd-on per room+$75
Drywall & Patching
-
Nail holesIncluded
-
Small cosmetic patchDime to golf-ball size$40
-
Medium patchUp to ~6" × 6"$75
Texture
-
Small patch texture blending only$40
-
Large texture repair / matching / re-texturingNot offered—
Ceilings
-
Ceiling painting (smooth ceilings only)Price per room$125
-
Popcorn / acoustic ceilingsNot painted (risk of crumbling/surface failure)—
Trim & Doors
-
BaseboardsPer room$75
-
Door + frameEach$60
Trim Color Policy
-
Repaint same colorAllowed
-
Light → darker colorAllowed
-
Dark → light conversionsNot offered—
Furniture
-
Furniture movingPer room$95
Paint Policy
Common brands used: Sherwin-Williams and Valspar (professional lines). Alternate brands must be supplied by the customer.
If Nantahala Interior Painting purchases paint for your project, paint is billed at cost + 20%.
What’s Included in Every Job
- Light surface preparationIncluded
- Nail hole fillingIncluded
- Caulking of trim gaps & cracksIncluded
-
Paint applied for proper, uniform coverageUp to two coatsIncluded
- Floor & furniture protectionIncluded
- Standard consumables (rollers, tape, caulk)Included
- Full cleanupIncluded
Download the Full Price Sheet (PDF)
Prefer the printable version? Download it here.
Note: Final quotes may vary based on layout, cut-ins, prep needs, and site conditions.